Power is fed from
Tamilnadu Electricity Board (TNEB) 110 kV dedicated
substation next door to Tidel Park.
Grid
Power

- Incoming power is
through 2 x 33 kV feeders.
- Power distributed
through 6 x 2500 kVA transformers.
- XLPE-FRLS cables used
for power distribution.
- High redundancy
provided in power 'rising mains' and floor level
distribution boards.
- Comprehensive
earthing and lightning protection provided.
Captive
Power
- Adequate backup power
using 5 nos. 2000KVA and one no. 500 kVA DG sets
totaling 10.5 mVA. (8.5 MW) for high reliability.
- All DG sets are on AMF panel to ensure that all emergency
services such as select lifts, corridor lighting
etc. are energised immediately on failure of main
power.
- The DG sets are
housed in an acoustically treated enclosure
- Flue Gas
Desulpherisation (FGD) system is installed
for pollution control.
- Fuel tank has a
capacity of 60,000 litres, adequate for 5 days
operation is provided.
|